Branch and bound crossed with GA to solve hybrid flowshops (Q1296101): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Two-Stage, Hybrid Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: Branch and bound algorithm for the flow shop with multiple processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-stage parallel-processor flowshop problem with minimum flowtime / rank
 
Normal rank

Revision as of 21:19, 28 May 2024

scientific article
Language Label Description Also known as
English
Branch and bound crossed with GA to solve hybrid flowshops
scientific article

    Statements

    Branch and bound crossed with GA to solve hybrid flowshops (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    10 September 2000
    0 references
    0 references
    0 references
    0 references
    0 references
    genetic algorithm
    0 references
    hybrid flowshop scheduling
    0 references
    branch-and-bound algorithm
    0 references
    heuristics
    0 references
    initial upper bound
    0 references