A comparative study of lot sizing procedures for multi-stage assembly systems (Q1835837): Difference between revisions
From MaRDI portal
Set profile property. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Dynamic Lot Size Models for Multi-Stage Assembly Systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A capacity constrained singlefacility dynamic lot-size model / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3926331 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Production scheduling and sequencing for multi-stage production systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Facilities in Series Inventory Model with Nested Schedules / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach / rank | |||
Normal rank |
Revision as of 16:59, 13 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A comparative study of lot sizing procedures for multi-stage assembly systems |
scientific article |
Statements
A comparative study of lot sizing procedures for multi-stage assembly systems (English)
0 references
1983
0 references
comparative study
0 references
heuristic procedures
0 references
minimum cost
0 references
multi-stage assembly systems
0 references
level-by-level approaches
0 references
period-by-period approach
0 references
dynamic lot sizing problem
0 references
single item, multi-level production system
0 references
finite horizon
0 references
determination of optimal lot sizes
0 references
0 references