Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (Q5059407): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Parallel metaheuristics: recent advances and new trends / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flexible lot sizing in hybrid make-to-order/make-to-stock production planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4442937 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A robust optimization approach for an integrated dynamic cellular manufacturing system and production planning with unreliable machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic lot sizing for unreliable production system with shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Subset simulation for multi-objective optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concave-cost production planning problem with remanufacturing options / rank
 
Normal rank

Latest revision as of 04:51, 31 July 2024

scientific article; zbMATH DE number 7637167
Language Label Description Also known as
English
Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm
scientific article; zbMATH DE number 7637167

    Statements

    Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (English)
    0 references
    23 December 2022
    0 references
    lot-sizing and scheduling
    0 references
    reliability
    0 references
    agility
    0 references
    clustering method
    0 references
    multi-objective metaheuristics
    0 references

    Identifiers