A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays (Q5443372): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/978-3-540-77918-6_5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2131385779 / rank
 
Normal rank

Revision as of 23:33, 19 March 2024

scientific article; zbMATH DE number 5237483
Language Label Description Also known as
English
A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays
scientific article; zbMATH DE number 5237483

    Statements

    A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays (English)
    0 references
    0 references
    20 February 2008
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references