An evolutionary approach for the design and scheduling of electroplating facilities (Q928697): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4023071 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An evolutionary approach for the design and scheduling of electroplating facilities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2723294 / rank
 
Normal rank

Revision as of 10:45, 28 June 2024

scientific article
Language Label Description Also known as
English
An evolutionary approach for the design and scheduling of electroplating facilities
scientific article

    Statements

    An evolutionary approach for the design and scheduling of electroplating facilities (English)
    0 references
    0 references
    0 references
    11 June 2008
    0 references
    Cyclic hoist scheduling problem
    0 references
    Design of electroplating facilities
    0 references
    Evolutionary algorithm
    0 references
    Linear programming evaluation model
    0 references

    Identifiers