A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flowshop scheduling with machine and resource-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5806242 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Harmony search algorithm with dynamic control parameters / rank
 
Normal rank
Property / cites work
 
Property / cites work: New multi-objective method to solve reentrant hybrid flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Chaotic characteristics of a one-dimensional iterative map with infinite collapses / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling flexible flow lines with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new meta-heuristic algorithm for continuous engineering optimization: harmony search theory and practice / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nature-inspired approach: an enhanced moth swarm algorithm for global optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved harmony search algorithm for solving optimization problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy modeling and harmony search optimization for machining system with general repair, standby support and vacation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for a realistic variant of flowshop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cost minimization of butter-oil processing plant using artificial bee colony technique / rank
 
Normal rank
Property / cites work
 
Property / cites work: Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hybrid flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Choquet integral for criteria aggregation in the flexible job-shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid chaotic genetic algorithm for short-term hydro system scheduling / rank
 
Normal rank

Revision as of 17:07, 24 July 2024

scientific article
Language Label Description Also known as
English
A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation
scientific article

    Statements

    A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    6 March 2021
    0 references
    flexible flow shop scheduling
    0 references
    multi-objective harmony search
    0 references
    Gaussian mutation
    0 references
    simulation and computational experiments
    0 references
    sequence-dependent setup times
    0 references
    response surface methodology
    0 references
    0 references
    0 references

    Identifiers