Optimizing a production system with rework and equal sized batch shipments (Q850297): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-stage production-inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determination of Optimum Production Quantity for a Two-Stage Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: The EOQ repair and waste disposal model with variable setup numbers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic ordering quantities for recoverable item inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4789904 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizing with Random Yields: A Review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs) / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multistage Production to Order with Rework Capability / rank
 
Normal rank
Property / cites work
 
Property / cites work: EBQ for a multistage production system considering rework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Operating Policy for a Bottleneck with Random Rework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Batch Sizing and Repair Strategies for Operations with Repairable Jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determining a threshold control policy for an imperfect production system with rework jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot-sizing for a single-stage single-product production system with rework of perishable production defectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3619076 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Comment on Determination of Optimum Production Quantity for a Two-Stage Production System / rank
 
Normal rank

Latest revision as of 22:56, 24 June 2024

scientific article
Language Label Description Also known as
English
Optimizing a production system with rework and equal sized batch shipments
scientific article

    Statements

    Optimizing a production system with rework and equal sized batch shipments (English)
    0 references
    0 references
    0 references
    15 November 2006
    0 references
    lot sizing
    0 references
    scheduling
    0 references
    rework
    0 references
    batching
    0 references
    0 references
    0 references

    Identifiers