Reduction of job-shop problems to flow-shop problems with precedence constraints (Q1296695): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(97)00129-x / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2075696138 / rank | |||
Normal rank |
Latest revision as of 09:13, 30 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of job-shop problems to flow-shop problems with precedence constraints |
scientific article |
Statements
Reduction of job-shop problems to flow-shop problems with precedence constraints (English)
0 references
2 August 1999
0 references
optimization
0 references
scheduling
0 references
job-shop environment
0 references
flow-shop
0 references
heuristics
0 references
0 references
0 references
0 references