Heuristics for hybrid flow shops with controllable processing times and assignable due dates (Q1603337): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/s0305-0548(01)00040-5 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2039740342 / rank | |||
Normal rank |
Latest revision as of 09:24, 30 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Heuristics for hybrid flow shops with controllable processing times and assignable due dates |
scientific article |
Statements
Heuristics for hybrid flow shops with controllable processing times and assignable due dates (English)
0 references
11 July 2002
0 references
0 references