Scheduling two-machine no-wait open shops to minimize makespan (Q707009): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2003.09.005 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2003.09.005 / rank | |||
Normal rank |
Revision as of 07:37, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling two-machine no-wait open shops to minimize makespan |
scientific article |
Statements
Scheduling two-machine no-wait open shops to minimize makespan (English)
0 references
9 February 2005
0 references
Scheduling
0 references
No-wait
0 references
Open shop
0 references
Branch-and-bound
0 references
Heuristic
0 references
0 references