Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2004.04.012 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2004.04.012 / rank | |||
Normal rank |
Latest revision as of 11:12, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs |
scientific article |
Statements
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (English)
0 references
27 June 2005
0 references
Scheduling
0 references
Sequence-dependent setup
0 references
Changeover cost
0 references
Multiple capacitated resources
0 references
0 references
0 references
0 references
0 references
0 references