Scheduling a two-stage flowshop under makespan constraint (Q2476691): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.mcm.2004.12.016 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.MCM.2004.12.016 / rank
 
Normal rank

Latest revision as of 21:26, 18 December 2024

scientific article
Language Label Description Also known as
English
Scheduling a two-stage flowshop under makespan constraint
scientific article

    Statements

    Scheduling a two-stage flowshop under makespan constraint (English)
    0 references
    0 references
    12 March 2008
    0 references
    scheduling
    0 references
    flowshop
    0 references
    heuristics
    0 references
    approximation algorithms
    0 references

    Identifiers