MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (Q3598683): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1051/ro:2007014 / rank | |||
Property / DOI | |||
Property / DOI: 10.1051/RO:2007014 / rank | |||
Normal rank |
Latest revision as of 12:53, 21 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs |
scientific article |
Statements
MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (English)
0 references
3 February 2009
0 references
lot-sizing
0 references
setup time
0 references
shortage cost
0 references
safety stock deficit
0 references
production planning
0 references
mixed integer programming
0 references
heuristic
0 references
0 references