MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (Q3598683): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1051/ro:2007014 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1051/RO:2007014 / rank
 
Normal rank

Latest revision as of 12:53, 21 December 2024

scientific article
Language Label Description Also known as
English
MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
scientific article

    Statements

    MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (English)
    0 references
    0 references
    0 references
    3 February 2009
    0 references
    lot-sizing
    0 references
    setup time
    0 references
    shortage cost
    0 references
    safety stock deficit
    0 references
    production planning
    0 references
    mixed integer programming
    0 references
    heuristic
    0 references
    0 references
    0 references

    Identifiers