Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem (Q630678): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.camwa.2010.09.046 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.CAMWA.2010.09.046 / rank | |||
Normal rank |
Revision as of 05:35, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem |
scientific article |
Statements
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem (English)
0 references
19 March 2011
0 references
scheduling
0 references
single machine
0 references
maximum earliness
0 references
tardy jobs
0 references
efficient solution
0 references
0 references
0 references