Minimizing the number of late jobs when the start time of the machine is variable (Q1758276): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.orl.2012.05.006 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.ORL.2012.05.006 / rank
 
Normal rank

Latest revision as of 08:52, 11 December 2024

scientific article
Language Label Description Also known as
English
Minimizing the number of late jobs when the start time of the machine is variable
scientific article

    Statements

    Minimizing the number of late jobs when the start time of the machine is variable (English)
    0 references
    8 November 2012
    0 references
    single machine scheduling
    0 references
    number of late jobs
    0 references
    Pareto optimal points
    0 references
    \(\epsilon \)-constraint approach
    0 references
    0 references
    0 references

    Identifiers