A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan (Q1991261): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.ejor.2018.07.040 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.EJOR.2018.07.040 / rank | |||
Normal rank |
Latest revision as of 16:47, 16 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan |
scientific article |
Statements
A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan (English)
0 references
30 October 2018
0 references
parallel-batch
0 references
two agents
0 references
release dates
0 references
deterioration
0 references
0 references
0 references
0 references