A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.3390/a9040063 / rank | |||
Property / DOI | |||
Property / DOI: 10.3390/A9040063 / rank | |||
Normal rank |
Latest revision as of 06:51, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags |
scientific article |
Statements
A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (English)
0 references
26 March 2019
0 references
Summary: Modeling and optimizing organizational processes, such as the one represented by the Resource-Constrained Project Scheduling Problem (RCPSP), improve outcomes. Based on assumptions and simplification, this model tackles the allocation of resources so that organizations can continue to generate profits and reinvest in future growth. Nonetheless, despite all of the research dedicated to solving the RCPSP and its multi-mode variations, there is no standardized procedure that can guide project management practitioners in their scheduling tasks. This is mainly because many of the proposed approaches are either based on unrealistic/oversimplified scenarios or they propose solution procedures not easily applicable or even feasible in real-life situations. In this study, we solve a more true-to-life and complex model, Multimode RCPSP with minimal and maximal time lags (MRCPSP/max). The complexity of the model solved is presented, and the practicality of the proposed approach is justified depending on only information that is available for every project regardless of its industrial context. The results confirm that it is possible to determine a robust makespan and to calculate an execution time-frame with gaps lower than 11\% between their lower and upper bounds. In addition, in many instances, the solved lower bound obtained was equal to the best-known optimum.
0 references
MRCPSP/max
0 references
discrete artificial bee colony (ABC)
0 references
entropy
0 references
robust scheduling
0 references