Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (Q2003565): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2019.05.002 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2019.05.002 / rank
 
Normal rank

Latest revision as of 18:59, 16 December 2024

scientific article
Language Label Description Also known as
English
Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
scientific article

    Statements

    Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (English)
    0 references
    0 references
    0 references
    9 July 2019
    0 references
    scheduling
    0 references
    hybrid flow shop
    0 references
    MILP
    0 references
    complete enumeration
    0 references
    makespan
    0 references
    solution representation
    0 references
    review
    0 references
    flowshop
    0 references
    0 references
    0 references

    Identifiers