Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization (Q6094862): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: An improved NEH-based heuristic for the permutation flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved NEH heuristic to minimize makespan in permutation flow shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: An empirical analysis of the optimality rate of flow shop heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Relationship between common objective functions, idle time and waiting time in permutation flow shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing in an Assembly Line with Blocking to Minimize Cycle Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint guided accelerated search for mixed blocking permutation flowshop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3378953 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: A variable block insertion heuristic for the blocking flowshop scheduling problem with total flowtime criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: New hard benchmark for flowshop scheduling problems minimising makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems / rank
 
Normal rank

Latest revision as of 03:08, 3 August 2024

scientific article; zbMATH DE number 7748149
Language Label Description Also known as
English
Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization
scientific article; zbMATH DE number 7748149

    Statements

    Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    10 October 2023
    0 references
    heuristic
    0 references
    blocking flow shop
    0 references
    makespan
    0 references
    idle time
    0 references
    blocking time
    0 references
    0 references

    Identifiers