Person:244627: Difference between revisions

From MaRDI portal
Person:244627
m AuthorDisambiguator moved page Débora P. Ronconi to Débora P. Ronconi: Duplicate
Created automatically from import240128110107
 
Line 1: Line 1:
{{Person}}
{{person}}

Latest revision as of 11:29, 28 January 2024

Available identifiers

zbMath Open ronconi.debora-pMaRDI QIDQ244627

List of research outcomes





PublicationDate of PublicationType
The multiperiod two‐dimensional non‐guillotine cutting stock problem with usable leftovers2023-11-17Paper
Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry2023-08-08Paper
Step cost functions in a fleet size and mix vehicle routing problem with time windows2022-09-26Paper
A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers2021-07-25Paper
Metaheuristics for the online printing shop scheduling problem2021-06-07Paper
Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem2021-04-20Paper
A filtered beam search method for the \(m\)-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs2019-11-19Paper
Mixed-Integer Programming Models for Flowshop Scheduling Problems Minimizing the Total Earliness and Tardiness2017-02-03Paper
A biased random key genetic algorithm for the field Technician scheduling problem2016-11-17Paper
List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility2016-10-06Paper
A MILP model for an extended version of the flexible job shop problem2014-04-30Paper
New heuristics for total tardiness minimization in a flexible flowshop2013-04-23Paper
Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming2011-04-01Paper
The single machine earliness and tardiness scheduling problem: lower bounds and a branch-and-bound algorithm2010-09-22Paper
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date2008-10-08Paper
Optimizing transportation and storage of final products in the sugar and ethanol industry: a case study2007-02-13Paper
Method of sentinels for packing items within arbitrary convex regions2007-01-26Paper
Orthogonal packing of rectangular items within arbitrary convex regions by nonlinear optimization2006-06-30Paper
A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking2006-03-07Paper
Lower bounding schemes for flowshops with blocking in-process2005-03-16Paper
Optimizing the packing of cylinders into a rectangular container: A nonlinear approach2004-11-22Paper
Minimizing earliness and tardiness penalties in a single-machine problem with a common due date2004-11-22Paper
Minimization subproblems and heuristics for an applied clustering problem2003-04-10Paper
Minimizing Total Tardiness: A Case Study in an Autoparts Factory2002-09-30Paper
Tabu search for total tardiness minimization in flowshop scheduling problems2000-11-08Paper
Models, constructive heuristics, and benchmark instances for the flexible job shop scheduling problem with sequencing flexibility and position-based learning effectN/APaper
Local search and trajectory metaheuristics for the flexible job shop scheduling problem with sequencing flexibility and position-based learning effectN/APaper

Research outcomes over time

This page was built for person: Débora P. Ronconi