A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation (Q2572847): Difference between revisions
From MaRDI portal
Created a new Item |
Added link to MaRDI item. |
||
links / mardi / name | links / mardi / name | ||
Revision as of 07:07, 3 February 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation |
scientific article |
Statements
A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation (English)
0 references
4 November 2005
0 references
Stochastic scheduling
0 references
Flow shop
0 references
Expected makespan
0 references
Weibull distribution
0 references
Coefficient of variation
0 references
Heuristic
0 references