Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (Q5059407): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Added link to MaRDI item.
links / mardi / namelinks / mardi / name
 

Revision as of 12:39, 8 February 2024

scientific article; zbMATH DE number 7637167
Language Label Description Also known as
English
Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm
scientific article; zbMATH DE number 7637167

    Statements

    Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (English)
    0 references
    23 December 2022
    0 references
    0 references
    lot-sizing and scheduling
    0 references
    reliability
    0 references
    agility
    0 references
    clustering method
    0 references
    multi-objective metaheuristics
    0 references