Two-machine flowshop scheduling with job class setups to minimize total flowtime (Q1781550): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q162228
RedirectionBot (talk | contribs)
Changed an Item
Property / author
 
Property / author: Cheng, T. C. Edwin / rank
 
Normal rank

Revision as of 22:04, 9 February 2024

scientific article
Language Label Description Also known as
English
Two-machine flowshop scheduling with job class setups to minimize total flowtime
scientific article

    Statements

    Two-machine flowshop scheduling with job class setups to minimize total flowtime (English)
    0 references
    0 references
    0 references
    27 June 2005
    0 references
    Flowshop scheduling
    0 references
    Job class setups
    0 references
    Heuristics
    0 references
    Branch-and-bound algorithms
    0 references
    Total flowtime
    0 references

    Identifiers