Production lot-size model with fuzzy production rate and fuzzy demand rate for deteriorating item under permissible delay in payments (Q998716): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claims
RedirectionBot (talk | contribs)
Changed an Item
Property / author
 
Property / author: Gour Chandra Mahata / rank
 
Normal rank
Property / author
 
Property / author: Adrijit Goswami / rank
 
Normal rank

Revision as of 05:04, 16 February 2024

scientific article
Language Label Description Also known as
English
Production lot-size model with fuzzy production rate and fuzzy demand rate for deteriorating item under permissible delay in payments
scientific article

    Statements

    Production lot-size model with fuzzy production rate and fuzzy demand rate for deteriorating item under permissible delay in payments (English)
    0 references
    0 references
    0 references
    9 February 2009
    0 references
    0 references
    fuzzy inventory model
    0 references
    fuzzy total cost
    0 references
    fuzzy demand rate
    0 references
    fuzzy production rate
    0 references
    0 references
    0 references