Preemptive scheduling of equal-length jobs to maximize weighted throughput. (Q1426730): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 04:19, 5 March 2024

scientific article
Language Label Description Also known as
English
Preemptive scheduling of equal-length jobs to maximize weighted throughput.
scientific article

    Statements

    Preemptive scheduling of equal-length jobs to maximize weighted throughput. (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    15 March 2004
    0 references
    0 references
    Single machine preemptive scheduling
    0 references
    Weighted throughput
    0 references