Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2011.07.011 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1981207682 / rank
 
Normal rank

Revision as of 15:19, 19 March 2024

scientific article
Language Label Description Also known as
English
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
scientific article

    Statements

    Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (English)
    0 references
    0 references
    0 references
    0 references
    21 April 2012
    0 references
    0 references
    flowshop
    0 references
    transportation
    0 references
    batch processing machine
    0 references
    lower bound
    0 references
    heuristic
    0 references
    0 references