Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation (Q2470273): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.apm.2006.08.022 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2049951406 / rank | |||
Normal rank |
Revision as of 18:56, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation |
scientific article |
Statements
Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation (English)
0 references
14 February 2008
0 references
non-renewal input
0 references
\(N\)-policy
0 references
waiting time
0 references