A methodology for cutting-tool management through the integration of CAPP and scheduling (Q5385471): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540600898049 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1999528579 / rank
 
Normal rank

Revision as of 20:01, 19 March 2024

scientific article; zbMATH DE number 5271440
Language Label Description Also known as
English
A methodology for cutting-tool management through the integration of CAPP and scheduling
scientific article; zbMATH DE number 5271440

    Statements

    A methodology for cutting-tool management through the integration of CAPP and scheduling (English)
    0 references
    6 May 2008
    0 references
    0 references
    tool management
    0 references
    CAPP
    0 references
    scheduling
    0 references
    flexible manufacturing systems
    0 references
    0 references