Scheduling arc maintenance jobs in a network to maximize total flow over time (Q406493): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.dam.2012.05.027 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2052429767 / rank | |||
Normal rank |
Revision as of 19:09, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling arc maintenance jobs in a network to maximize total flow over time |
scientific article |
Statements
Scheduling arc maintenance jobs in a network to maximize total flow over time (English)
0 references
8 September 2014
0 references
network flows
0 references
scheduling
0 references
maintenance planning
0 references
local search
0 references
hybrid algorithms
0 references