Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (Q958115): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2008.01.033 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2010061772 / rank | |||
Normal rank |
Revision as of 20:02, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals |
scientific article |
Statements
Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (English)
0 references
2 December 2008
0 references
failure-prone systems
0 references
cumulative resources
0 references