Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study (Q3605414): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540601156215 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2017178549 / rank
 
Normal rank

Revision as of 21:15, 19 March 2024

scientific article
Language Label Description Also known as
English
Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study
scientific article

    Statements

    Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study (English)
    0 references
    0 references
    0 references
    24 February 2009
    0 references
    0 references
    decomposition heuristics
    0 references
    job-shop scheduling
    0 references
    global schedules
    0 references
    rescheduling
    0 references
    semiconductor wafer fab scheduling
    0 references
    simulation
    0 references
    0 references