Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.cor.2014.02.005 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2083233352 / rank | |||
Normal rank |
Revision as of 20:53, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Minimizing the total completion time in a distributed two stage assembly system with setup times |
scientific article |
Statements
Minimizing the total completion time in a distributed two stage assembly system with setup times (English)
0 references
10 November 2016
0 references
scheduling
0 references
distributed two-stage assembly flowshop
0 references
hybrid meta-heuristics
0 references
total completion time
0 references