Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm (Q336334): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2011.08.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2083529397 / rank
 
Normal rank

Revision as of 21:16, 19 March 2024

scientific article
Language Label Description Also known as
English
Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm
scientific article

    Statements

    Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm (English)
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    flowshop scheduling
    0 references
    bi-objective
    0 references
    makespan
    0 references
    total flowtime
    0 references

    Identifiers