Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (Q856208): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.11.019 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2089989890 / rank
 
Normal rank

Revision as of 22:28, 19 March 2024

scientific article
Language Label Description Also known as
English
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
scientific article

    Statements

    Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    7 December 2006
    0 references
    0 references
    0 references
    0 references
    0 references
    production-transportation process
    0 references
    cyclic scheduling
    0 references
    robotic scheduling
    0 references
    parametric PERT-CPM model
    0 references
    time windows
    0 references
    critical path
    0 references
    0 references