Scheduling a hybrid flowshop with batch production at the last stage (Q875417): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.cor.2005.10.014 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1999035181 / rank | |||
Normal rank |
Revision as of 22:37, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling a hybrid flowshop with batch production at the last stage |
scientific article |
Statements
Scheduling a hybrid flowshop with batch production at the last stage (English)
0 references
13 April 2007
0 references
hybrid flowshop scheduling
0 references
batch production
0 references
Lagrangian relaxation
0 references
batch decoupling
0 references
improved dynamic programming
0 references