Minimizing total completion time in two-stage hybrid flow shop with dedicated machines (Q622160): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2010.10.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2089830689 / rank
 
Normal rank

Revision as of 23:26, 19 March 2024

scientific article
Language Label Description Also known as
English
Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
scientific article

    Statements

    Minimizing total completion time in two-stage hybrid flow shop with dedicated machines (English)
    0 references
    0 references
    31 January 2011
    0 references
    two-stage hybrid flow shop
    0 references
    computational complexity
    0 references
    heuristic
    0 references
    worst case bound on relative error
    0 references

    Identifiers