Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows (Q3635206): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/opre.51.3.487.14949 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2069633728 / rank | |||
Normal rank |
Latest revision as of 00:06, 20 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows |
scientific article |
Statements
Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows (English)
0 references
5 July 2009
0 references