A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2005.10.005 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1973950629 / rank
 
Normal rank

Revision as of 01:17, 20 March 2024

scientific article
Language Label Description Also known as
English
A multi-objective lead time control problem in multistage assembly systems using an interactive method
scientific article

    Statements

    A multi-objective lead time control problem in multistage assembly systems using an interactive method (English)
    0 references
    0 references
    0 references
    30 June 2006
    0 references
    multiple objective programming
    0 references
    production
    0 references
    numerical example
    0 references
    multistage assembly system
    0 references
    queueing network
    0 references
    manufacturing
    0 references
    Poisson process
    0 references
    optimal control
    0 references
    STEM method
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references