A maximum principle based combined method for scheduling in a flexible manufacturing system (Q1902498): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Q3337923 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control of production rate in a failure prone manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Value function approximation via linear programming for FMS scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995065 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Necessary optimality conditions for a generalized problem of production scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3863413 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production control of a manufacturing system with multiple machine states / rank
 
Normal rank

Revision as of 18:18, 23 May 2024

scientific article
Language Label Description Also known as
English
A maximum principle based combined method for scheduling in a flexible manufacturing system
scientific article

    Statements

    A maximum principle based combined method for scheduling in a flexible manufacturing system (English)
    0 references
    0 references
    0 references
    0 references
    13 May 1996
    0 references
    continuous time dynamic model
    0 references
    discrete scheduling
    0 references
    manufacturing
    0 references
    maximum principle
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references