Optimal inspection effort and scheduling for a manufacturing process with repair (Q1127131): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Using break-even quality level for selecting acceptance sampling plans given a prior distribution / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Location of Inspection Stations in a Multistage Production Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quality control of the M/G/1 queue / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow time distributions in a \(K\) class \(M/G/1\) priority feedback queue / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time-Sharing Service Systems. I / rank
 
Normal rank
Property / cites work
 
Property / cites work: Priority Queues with Feedback / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Control of Single-Server Queuing Networks and Multi-Class <i>M</i>/<i>G</i>/1 Queues with Feedback / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4714399 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Analysis of a Simple Class of Multistage Inspection Plans / rank
 
Normal rank
Property / cites work
 
Property / cites work: Shortest Route Models for the Allocation of Inspection Effort on a Production Line / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach / rank
 
Normal rank

Latest revision as of 15:38, 28 May 2024

scientific article
Language Label Description Also known as
English
Optimal inspection effort and scheduling for a manufacturing process with repair
scientific article

    Statements

    Optimal inspection effort and scheduling for a manufacturing process with repair (English)
    0 references
    13 August 1998
    0 references
    0 references
    manufacturing process with repair
    0 references
    optimal inspection allocation
    0 references
    production system
    0 references
    multi-armed bandits
    0 references