The three-stage assembly flowshop scheduling problem (Q5939973): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Two-Stage Assembly Scheduling Problem: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Three-Stage Flow-Shops with Recessive Second Stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: A New Heuristic for Three-Machine Flow Shop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4231913 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3670909 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3980665 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops / rank
 
Normal rank

Revision as of 18:43, 3 June 2024

scientific article; zbMATH DE number 1623684
Language Label Description Also known as
English
The three-stage assembly flowshop scheduling problem
scientific article; zbMATH DE number 1623684

    Statements

    Identifiers