Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems (Q5943940): Difference between revisions
From MaRDI portal
Set profile property. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Sequencing in an Assembly Line with Blocking to Minimize Cycle Time / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems / rank | |||
Normal rank |
Revision as of 19:01, 3 June 2024
scientific article; zbMATH DE number 1648766
Language | Label | Description | Also known as |
---|---|---|---|
English | Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems |
scientific article; zbMATH DE number 1648766 |
Statements
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems (English)
0 references
21 January 2003
0 references
part input sequencing
0 references
flexible manufacturing systems
0 references
two-stage heuristic algorithms
0 references
0 references