Constructive and composite heuristic solutions to the \(P\|\sum C_i\) scheduling problem (Q5946533): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A new adaptive multi-start technique for combinatorial global optimizations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop sequencing with mean flowtime objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic for the n-job, M-machine flow-shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4055377 / rank
 
Normal rank
Property / cites work
 
Property / cites work: AN ADJACENT PAIRWISE APPROACH TO THE MEAN FLOW-TIME SCHEDULING PROBLEM / rank
 
Normal rank
Property / cites work
 
Property / cites work: ANALYSIS FOR MINIMIZING WEIGHTED MEAN FLOW-TIME IN FLOW-SHOP SCHEDULING / rank
 
Normal rank
Property / cites work
 
Property / cites work: A FLOWSHOP SCHEDULING ALGORITHM TO MINIMIZE TOTAL FLOWTIME / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient heuristic approach to the scheduling of jobs in a flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Landscapes, operators and heuristic search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some results of the worst-case analysis for flow shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic algorithm for mean flowtime objective in flowshop scheduling / rank
 
Normal rank

Latest revision as of 20:48, 3 June 2024

scientific article; zbMATH DE number 1659102
Language Label Description Also known as
English
Constructive and composite heuristic solutions to the \(P\|\sum C_i\) scheduling problem
scientific article; zbMATH DE number 1659102

    Statements

    Constructive and composite heuristic solutions to the \(P\|\sum C_i\) scheduling problem (English)
    0 references
    0 references
    0 references
    11 March 2002
    0 references
    0 references
    Scheduling
    0 references
    Flowshop
    0 references
    Heuristics
    0 references