An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time. (Q1412717): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Single machine scheduling to minimize weighted sum of completion times with secondary criterion - A branch and bound approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize the weighted sum of completion times with secondary criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the single-machine scheduling problem with minimum weighted completion time and maximum allowable tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on a scheduling problem with dual criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the extension of a result on scheduling with secondary criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4055377 / rank
 
Normal rank
Property / cites work
 
Property / cites work: ONE MACHINE SCHEDULING PROBLEM WITH DUAL CRITERIA / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Weighted Completion Times with Deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An algorithm for single machine sequencing with deadlines to minimize total weighted completion time / rank
 
Normal rank

Latest revision as of 12:55, 6 June 2024

scientific article
Language Label Description Also known as
English
An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time.
scientific article

    Statements

    An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time. (English)
    0 references
    0 references
    25 November 2003
    0 references
    0 references
    Scheduling
    0 references
    Branch-and-bound
    0 references
    Bicriterion
    0 references
    Deadline
    0 references