THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING (Q4650602): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q3056948 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4003376 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving a real-life assignment problem at universities / rank
 
Normal rank
Property / cites work
 
Property / cites work: The application of a tabu search metaheuristic to the assembly line balancing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow Shop Scheduling with Resource Flexibility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Workload balancing and loop layout in the design of a flexible manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: A lexicographic approach to bi-objective loading of a flexible assembly system / rank
 
Normal rank

Latest revision as of 18:14, 7 June 2024

scientific article; zbMATH DE number 2134934
Language Label Description Also known as
English
THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING
scientific article; zbMATH DE number 2134934

    Statements

    THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING (English)
    0 references
    0 references
    0 references
    18 February 2005
    0 references
    0 references
    Assignment problem
    0 references
    resource allocation
    0 references
    machine scheduling
    0 references
    meta-heuristics
    0 references