A two-echelon inventory optimization model with demand time window considerations (Q2574100): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Improved Algorithms for Economic Lot Size Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation Methods for the Uncapacitated Dynamic Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved Heuristics for Multi-Stage Requirements Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4380371 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new dynamic programming algorithm for the single item capacitated dynamic lot size model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal common due-date with limited completion time deviation / rank
 
Normal rank
Property / cites work
 
Property / cites work: An <i>O</i>(<i>T</i><sup>2</sup>) Algorithm for the <i>NI</i>/<i>G</i>/<i>NI</i>/<i>ND</i> Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Lot Size Models for Multi-Stage Assembly Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A New Optimization Algorithm for the Vehicle Routing Problem with Time Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Lot Sizing for Multi-Echelon Distribution Systems with Purchasing and Transportation Price Discounts / rank
 
Normal rank
Property / cites work
 
Property / cites work: The pickup and delivery problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Vehicle Routing with Time Windows: Two Optimization Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic Production Planning with Concave Costs and Capacity Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Optimization Algorithm for the Vehicle Routing Problem with Time Windows Based on Lagrangian Relaxation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Lot-Sizing Model with Demand Time Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Earliness-tardiness scheduling problems with a common delivery window / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determination of common due window location in a single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounded Production and Inventory Models with Piecewise Concave Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4314863 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Deterministic Multi-Period Production Scheduling Model with Backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach / rank
 
Normal rank

Latest revision as of 13:02, 11 June 2024

scientific article
Language Label Description Also known as
English
A two-echelon inventory optimization model with demand time window considerations
scientific article

    Statements

    A two-echelon inventory optimization model with demand time window considerations (English)
    0 references
    0 references
    0 references
    0 references
    16 November 2005
    0 references
    0 references
    Demand time-window
    0 references
    Dynamic programming
    0 references
    Lot-sizing
    0 references
    0 references
    0 references
    0 references