Analysis and solution to the single-level batch production smoothing problem (Q5438683): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A parallel shortest augmenting path algorithm for the assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—Sequencing JIT Mixed-Model Assembly Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing variation of production rates in just-in-time systems: A survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems” / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model, Just-in-Time Processes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times / rank
 
Normal rank

Latest revision as of 15:55, 27 June 2024

scientific article; zbMATH DE number 5229865
Language Label Description Also known as
English
Analysis and solution to the single-level batch production smoothing problem
scientific article; zbMATH DE number 5229865

    Statements

    Analysis and solution to the single-level batch production smoothing problem (English)
    0 references
    0 references
    0 references
    24 January 2008
    0 references
    just-in-time
    0 references
    mixed-model production
    0 references
    level schedules
    0 references
    production smoothing
    0 references
    NP-hard
    0 references
    heuristics
    0 references

    Identifiers