Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control (Q2475844): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q3996922 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical methods to study the polling systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two finite queues with relative priority in a single server system with phase type distributions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of finite-capacity polling systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Blocking probability, throughput and waiting time in finite capacity polling systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3923308 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4109064 / rank
 
Normal rank

Latest revision as of 18:01, 27 June 2024

scientific article
Language Label Description Also known as
English
Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control
scientific article

    Statements

    Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control (English)
    0 references
    0 references
    0 references
    11 March 2008
    0 references
    performance evaluation
    0 references
    polling models
    0 references
    regenerative process
    0 references

    Identifiers