AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM (Q3632031): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: A Production Line that Balances Itself / rank
 
Normal rank
Property / cites work
 
Property / cites work: Performance of Bucket Brigades When Work Is Stochastic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Interblock Crane Deployment in Container Terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deriving decision rules to locate export containers in container yards / rank
 
Normal rank
Property / cites work
 
Property / cites work: A beam search algorithm for the load sequencing of outbound containers in port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with spatial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling in container yards with inter-crane interference / rank
 
Normal rank

Revision as of 17:21, 1 July 2024

scientific article
Language Label Description Also known as
English
AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
scientific article

    Statements

    AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM (English)
    0 references
    0 references
    0 references
    23 June 2009
    0 references
    0 references
    crane
    0 references
    scheduling
    0 references
    non-crossing constraint
    0 references
    optimization
    0 references