RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING (Q5850789): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: On estimating the mean function of a Gaussian process / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Improving job-shop schedules through critical pairwise exchanges / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Local search heuristics for two-stage flow shop problems with secondary criterion / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Fuzzy sets / rank | |||
Normal rank |
Revision as of 09:44, 2 July 2024
scientific article; zbMATH DE number 5658766
Language | Label | Description | Also known as |
---|---|---|---|
English | RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING |
scientific article; zbMATH DE number 5658766 |
Statements
RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING (English)
0 references
15 January 2010
0 references
hybrid flow shop
0 references
fuzzy inference systems (FIS)
0 references
reliability
0 references
availability
0 references